Construction strategy of Urban substation under
Abstract
from the constraints of policies and regulations, natural environment and social environment, this paper analyse s the restriction factors of substation construction, puts forward perfect planning, including specific strstecpes in dock ing mechanism, optimizing encpneering DESICP, coordination responsibilities for project localization implementation, cons Truction management Improvement, new technology of construction, in order to improve the quality and efficiency of</ b11>
Substation Construction in center urban area.
Keywords
Full Text:
PDFReferences
Zhang Hongxia , Shi yuzhu , Wang Peihua , , and so on . Cross-regional power grids involving nature reserves Set items to note several issues [J ]. Central Power ,2011,24 (4) : 29-32.
Liu Zhen , Liu , Fresh and healthy , , and so on . conflict and countermeasures in the external environment of power grid construction ["]. Power Construction , 2010,31 (1): 40-44.
Chianguo , Wang , Huangjian , , and so on . Full process of grid construction projects under multiple constraints closed-loop control countermeasure research [J ].Zhejiang Power , 2014 (6 : 6-
Wangzhongdao . Grey Predictive model related technology research [D. Chengdu : Southwest Jiaotong University , 2008:103-110.
Zempo . Grey Predictive Modeling technology research [D. Nanjing : Nanjing University of Aeronautics and Astronautics , 2012:56-63.
DOI: https://doi.org/10.18686/utc.v2i1.41
Refbacks
- There are currently no refbacks.
Copyright (c) 2018 Yanyun Jin
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.