Coupling Mechanism of Engineering Quality Risk Prevention and Control with Schedule Optimization in Real Estate Development Projects

Guohao Qiu

Abstract


In real estate development projects, engineering quality and construction progress are the core elements that affect the success or
failure of the project. The imbalance between the two can easily lead to problems such as resource waste and cost overruns. This article is
based on systems theory and full lifecycle management theory, analyzing the interaction between quality risk and project schedule, and constructing a coupling mechanism between quality risk prevention and schedule optimization. Through integrated goal coordination, dynamic
information linkage, and proactive risk warning and intervention, the coordinated promotion of the two is achieved. The research aims to provide theoretical support and practical reference for balancing quality and schedule in real estate development projects and improving project
management efficiency.

Keywords


Real Estate Development Projects; Quality Risk Prevention and Control; Progress Optimization; Coupling Mechanism

Full Text:

PDF

Included Database


References


[1] Chen Jichun Empirical Study on the Coupling and Coordinated Development of Real Estate Industry and Regional Economy [J].

2021 (2011-11): 128-130.

[2] Chen Lei The spatiotemporal evolution analysis of the coordinated development of the real estate industry and manufacturing industry: taking 35 large and medium-sized cities as examples [D]. Chongqing University, 2020.

[3] Xu Xiaoyun A Real Estate Company B Prefabricated Building Project Risk Identification and Response Research [D]. Yunnan University, 2021.




DOI: https://doi.org/10.18686/utc.v11i3.277

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Guohao Qiu