About calculation and research on the capacity of receiving and sending vehicles in the depot of zigzag access section of urban rail transit
Abstract
The paper utilizes the time interval method and simulation technology to analyze and compute the throughput capacity of urban rail
transit (UTO):Unattended Train Operation) lines, thereby presenting a novel operational solution for UTO mode in our country. Additionally, it introduces a fresh perspective and methodology for rail transit operation.
transit (UTO):Unattended Train Operation) lines, thereby presenting a novel operational solution for UTO mode in our country. Additionally, it introduces a fresh perspective and methodology for rail transit operation.
Keywords
Depot; Zigzag; Entrance and Exit Lines; Transit-receive
Full Text:
PDFReferences
[1] The People’s Republic of China (PRC) GB50157-2013. Code for design of metro[S].
[2] Wan li He. The design of the subway section and the design of the line of the subway. JOURNAL OF RAILWAY ENGINEERING
SOCIETY, NO.6 Jun 2018: 81-87.
[3] HUA GAO. Discussion on Design of Track Joining of Departure and Arrival Track of Vehicle Depot of Urban Rail Transit. JOURNAL OF RAILWAY ENGINEERING SOCIETY, NO.6 Jun 2012: 115-117.
[4] Peng Zhang. Comprehensively Analyzing the Conjunction Scheme of Station and Out & In Line of Dalian Metro Depot[j] Journal
of Railway Engineering Society, NO.2 2008:80-83.
DOI: https://doi.org/10.18686/utc.v10i2.229
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Yongming Zhang,Jingxiang Sun*