Application of Advanced Long Pipe Shed Construction Technology in Drift-Rock Mound Tunnel
Abstract
Floating rock pile belongs to a special geological type, body stability of tunnel hole had a serious impact, based on the tunnel, drift
rock pile in high altitude cold and arid regions of engineering characteristics were analyzed, and put forward using advanced and long pipe
roof construction technology to carry on the preliminary support, introduces its construction process, to ensure the safety of the floating pile
rock tunnel construction, to provide technical reference for tunnel construction problems of the same type.
rock pile in high altitude cold and arid regions of engineering characteristics were analyzed, and put forward using advanced and long pipe
roof construction technology to carry on the preliminary support, introduces its construction process, to ensure the safety of the floating pile
rock tunnel construction, to provide technical reference for tunnel construction problems of the same type.
Keywords
Tunnel Engineering; Boulders; Lead Long Pipe Shed
Full Text:
PDFReferences
[1] Niu Xinxin. Analysis on construction technology of advance pipe-shed support in expressway tunnel [J]. Traffic World, 2019(21):
104-105.
[2] Liu Bing. Discussion on construction technology of tunnel advanced long pipe shed support [J]. China’s high-tech enterprises,
2014(05): 77-78.
[3] Liu Guoqing. Construction Technology of Advanced Long Pipe Roof in Expressway Tunnel Construction [J]. Sichuan Cement,
2020(04): 237.
[4] Xinxin Niu. Analysis on construction technology of advance pipe-shed support in expressway tunnel [J]. Traffic World, 2019(21):
104-105.
[5] Ma Tiangang. Large Pipe Roof Pre-grouting Support Technology in Soft Rock Tunnel Construction [J]. Sichuan building materials,
2019,45(02): 122-124.
DOI: https://doi.org/10.18686/utc.v10i1.226
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Peng Chen,Yuanlang Dong,Le Li,Senyang Wu,Wanyin Li